Back to Search Results

new

2026 Ford Bronco Badlands

VIN: 1FMEE9BP1TLA80624 STOCK NO. TLA80624

car-gallery-1 car-gallery-2 car-gallery-3 car-gallery-4 car-gallery-5 car-gallery-6 car-gallery-7 car-gallery-8 car-gallery-9 car-gallery-10 car-gallery-11 car-gallery-12 car-gallery-13 car-gallery-14 car-gallery-15 car-gallery-16 car-gallery-17 car-gallery-18 car-gallery-19 car-gallery-20 car-gallery-21 car-gallery-22 car-gallery-23 car-gallery-24 car-gallery-25
A straightforward, hassle-free car-buying experience.
This new 2026 Ford Bronco is for sale and conveniently located in Elk Grove, California. Your Certified CarPro Rachel Wood, will work with their team to deliver the best car buying experience you’ve ever had!

Here’s how to get started:

  1. Submit the form to confirm vehicle availability and contact your Certified CarPro.
  2. The Certified CarPro and their team will receive your info and contact you.
  3. Set an appointment with your Certified CarPro, then head to the dealership and enjoy a VIP car buying experience!

Vehicle Overview

  • Miles: 8
  • 16 City / 17 Highway
  • Drive: 4
  • Engine: 2.7
  • Transmission: Automatic
  • Trim: Badlands
  • Exterior Color: Avalanche Gray Metallic

Features

  • 4 Cylinder Engine 4-Wheel Disc Brakes 7-Speed M/T A/C ABS Adjustable Steering Wheel Aluminum Wheels AM/FM Stereo Apple CarPlay Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Back-Up Camera Bluetooth Brake Assist Bucket Seats Child Safety Locks Conventional Spare Tire Cruise Control Daytime Running Lights Driver Air Bag Driver Vanity Mirror Engine Immobilizer Floor Mats Fog Lamps Four Wheel Drive Front Head Air Bag Front Side Air Bag Gasoline Fuel Heated Mirrors Heated Seats Intermittent Wipers Keyless Entry Keyless Start Leather Steering Wheel Locking/Limited Slip Differential MP3 Player Pass-Through Rear Seat Passenger Air Bag Passenger Vanity Mirror Power Door Locks Power Mirror(s) Power Steering Power Windows Privacy Glass Rear Head Air Bag Rollover Protection Bars Satellite Radio Security System Smart Device Integration Stability Control Steering Wheel Audio Controls Telematics Tire Pressure Monitor Tires - Front All-Terrain Tires - Rear All-Terrain Tow Hooks Traction Control Trip Computer Turbo/Supercharged Variable Speed Intermittent Wipers Vinyl Seats WiFi Hotspot
  • *CarPro is not responsible for the prices or information represented on each vehicle listed. Each individual dealership determines and posts the price and data on the vehicle. If you have any specific questions about a price or a vehicle, please contact the CarPro directly.

    The list of standard equipment and accessories contained on this document reflect equipment which was standard at the time vehicle was manufactured. This vehicle may or may not contain some or most of the equipment and accessories listed as a result of the vehicle identification number equipment compilation provided by a third party source. This VIN equipment compilation is provided as a service by the dealer and a third party source and is in no way intended to serve as a warranty or list of actual equipment contained on the vehicle.

    Location

    map

    Elk Grove Ford

    9645 Auto Center Drive Elk Grove California, 95757

    Get Directions
    carpro-headshot

    Rachel Wood

    CarPro Manager, Elk Grove Ford

    Unlock for Dealer Details

    $60,240

    Selling Price*

    carpro-headshot

    Rachel Wood

    100 Reviews

    Confirm Availability